Practice DI Questions Answers bank exam preparation
Hello Friends, We are sharing some important Data Interpretation Questions with Answers solutions for bank PO in pdf, helpful for SBI and IBPS PO and Clerk exams 2017 2018. These Line Graphs - Data Interpretation Questions are very important for SBI PO exam and IBPS PO & other upcoming banking exams like for IBPS PO Pre and Mains, SBI PO Pre and Mains, SSC, CAT, XAT, NMAT, MAT & other exams 2017.
Data interpretation for bank exams provided by Bank4Study.com will help you a lot in your goal to crack the test. You will be taught to solve these questions better by solving many Data Interpretation problems.
You need to practice as many questions as possible, and bank4study.com helps you by providing DI questions for SBI PO or IBPS PO Clerk with PDFs. These questions will help you master the concepts of data interpretation better. Once you are sure that you have mastered the concepts involved in data interpretation, then you can easily crark the Quantitative Section of IBPS PO & SBI PO Pre and Mains.
Data Interpretation Questions with Solutions
Directions(Question 1 to 3) : Refer to the following Bar questions that follow:
Question 1: What is the average value of shown in the diagram?
(a) Rs. 103.48 crore
(b) Rs. 105 crore
(c) Rs. 100 crore
(d) Rs.125.2 crore
Question 2: Compared to the performance in 1985 (i.e. taking it as the base), what can you say about the performances in the years 1984, 1985, 1986, 1987, 1988 respectively, in percentage terms?
(a) 150, 100, 211, 216, 97
(b) 100, 67, 141, 144, 65
(c) 150, 100, 200, 215, 100
(d) 120, 100, 220, 230, 68
Question 3: Which is the year in which the highest percentage decline is seen the value of contract secured compared to the preceding year?
(a) 1985
(b) 1988
(c) 1984
(d) 1986
Direction Questions (4 - 8): The table below shows the estimated cost (in Rs. Lakh) of a project of laying a railway line between two places.
Question 4: The total expenditure is required to be kept within Rs. 700 lakh by cutting the expenditure on administration equally in all the years. What will be the percentage cut for 1989?
(a) 22.6
(b) 32.6
(c) 42.5
(d) 52.6
Question 5: If the length of line to be laid each year is in proportion to the estimated cost for material and labour, what fraction of the total length is proposed to be completed by the third year?
(a) 0.9
(b) 0.7
(c) 0.6
(d) 0.3
Question 6: What is the approximate ratio of the total cost of materials for all the years bear to the total labour cost?
(a) 4 : 1
(b) 8 : 1
(c) 12:1
(d) 16 : 1
Question 7: If the cost of materials rises by 5% each year from 1990 onwards, by how much will the estimated cost rise?
(a) Rs. 11.4 lakh
(b) Rs. 16.4 lakh
(c) Rs.21.4 lakh
(d) Rs.26.4 lakh
Question 8: It is found at the end of 1990, that the entire amount estimated for the project has been spent. If for 1991, the actual amount spent was equal to that which was estimated, by what percent (approximately) has the actual expenditure exceeded the estimated expenditure?
(a) 39
(b) 29
(c) 19
(d) 9
What Others Are Reading
- Coding Decoding Questions Answers 25 Sets
- Puzzle 70 Sets for Exams - High Level
- How to Solve Input-Output Reasoning Questions Fast
- Direction Sense Questions
- Blood Relations Questions - Shortcuts
- How to Solve Coding-Decoding Fast - Shortcuts
- Seating And Circular Arrangement 95 Puzzles PDF 2017
- Series Completion Questions Tricks Shortcuts
- Pie Charts Data Interpretation Questions Click Here
- 10 Data Interpretation Sets - Free Download
- Want To Solve Some Hard DI Questions - Click Here
Data Interpretation Solutions with Answers
Answer 1: a
(100.5 + 67 + 141 + 143.9 + 65)/5 = 103.48
Answer 2: a
As we see the table we see that the performance of only year i.e. 88 is less than the year 85. Hence the percentage corresponding to 1988 should be less than 100. Thus we see that (c) cannot be the answer.
Also (b) cannot be the answer as it shows two of the two years having less than 100%.
Between options (a) and (d), the correct answer is (a). This is because the difference between the 1985 and 1988 performance is only 2 units on 67 units. Hence percentage wise, it has to be 97% and not 68%.
Answer 3: b
The highest percentage decrease over the previous year is in year 1988 as in the table, and the performance is almost half than that of the previous year. Such a decrease is not seen in any other year, so the right answer is b
Answer 4: c
Total expenditure = 52.1+267.5+196.4+209.5 = 725.5 lakhs.
If it has to be kept within 700 lakhs, the expenditures have to reduce by 25.5 lakhs.
So the expenditure reduced each year will be (25.5/4) = 6.375 lakhs.
Hence, percentage reduce for 1989 would be = (6.375/15) × 100 = 42.5%.
Answer 5: b
Costs of material and labor
1988 = 2.1
1989 = 95+70+15+25+25 = 230
1990 = 80+45+12+18+20 = 175
1991 = 75+60+16+21+18 = 190
Therefore proportion of these expenditures till 1990 = (2.1 + 230 + 175) / (2.1 + 230 + 175 + 190) = 0.6817.
This will also be the fraction of the total length of the line.
Answer 6: b
Total material cost =(95+80+75+70+45+60+15+12+16+25+18+21) = 532
Total labour cost = (2.1+25+20+18) = 65.1
Therefore the ratio = 532 : 65.1 = 8 : 1 (approximately)
Answer 7: b
The costs that can be taken under the head “Materials” are : Cement, steel, Bricks and
Other building materials.
The estimated cost in 1990 = 80 + 45 + 12 + 18 = 155
The estimated cost in 1991 = 75 + 60 + 16 + 21 = 172
Cost of material rises by 5%,
Cost would rise by 0.05X (155 + 172) = Rs.16.35 lakhs.
Answer 8: b
Amount spent till 1990 = Rs.725.5 lakhs
Estimated Expenditure for 1991 = 209.5 lakhs.
Hence the increase in expenditure will be 209.5 on 725.5 = 28.87%.